CASE STUDY:

CGU LONDON - TOILET REFURBISHMENT

CLIENT:

Glasgow Caledonian University

VALUE:

£250k

DURATION:

2 x Six Week Phases

GCU Glasgow Toilet Refurbishment
GCU Glasgow Toilet Refurbishment
GCU Glasgow Toilet Refurbishment

BRIEF:

The University appointed Camino Interiors on a Design & Build basis to upgrade their existing campus toilets spread over 3 levels.

We outsourced an architect to develop the design with each phase having a different theme.

The works were split into two phases so plenty of facilities remained in operation for the staff and students. Each area was stripped back to the shell & core, and a full refit was carried out including all new MEPH services.

SCOPE OF WORKS:

  • Strip out
  • Plumbing
  • Raised access flooring
  • Power & lighting
  • Ventilation
  • Fire alarm
  • Disability alarm
  • Partitioning
  • Plastering & rendering
  • Bespoke joinery
  • Toilet cubicle systems
  • Sanitaryware
  • Soft floor finishes
  • Decorations
  • Mirrors
  • Glass splashbacks
  • Signage