CASE STUDY:

CHARLOTTE TERRACE, KENSINGTON

CLIENT:

Picton

VALUE:

£50k

DURATION:

4 Weeks

Charlotte Terrace Kensington
Charlotte Terrace Kensington
Charlotte Terrace Kensington

BRIEF:

We were commissioned to enhance an existing office suite to incorporate a new meeting room and kitchen.

The works included the separation and modification of the existing landlords services including the plumbing, mechanical, electrical and fire alarm.

The works were undertaken on a design & build basis.

SCOPE OF WORKS:

  • Strip out
  • Ceiling modifications
  • Glazed partitions & doors
  • Power & lighting
  • Fire alarm system
  • Plumbing
  • Heating
  • Air conditioning
  • Bespoke joinery
  • Kitchen
  • Soft floor finishes
  • Decorations
  • Signage
  • Fixtures & fittings
  • White goods